RAMMING PROCESS

The ramming material is generally hygroscopic in nature. When ramming is done care should be taken not to open all the bags of ramming material simultaneously. Two or three bags should be open at a time. All the material should be mixed together. Moving a magnet material will remove the possibility of any magnetic material in the mass. The material should be heated to around 60 to 700C to remove moisture.

The furnace now made ready for ramming. The ground leak detector probe is placed in position with bottom asbestos sheet. The probe wires should be so arranged that all the lead should be inside the former diameter pointing vertically upwards approximately circularity spaced. The furnace coil coating is also sheed with asbestos sheet (one or two pc.). It should overlap each other. Asbestos paste should be made and applied over the lap joint so that the sheet remains in position, alternative, spring tension ring can be used. With this ring care must be taken not to move the sheets while changing the position of the ring.

Put the ramming mass in the furnace two or three inch level. Use spike rammer for 5 to 7 minutes and then use flat rammer for 10 minutes check if the level has gone down to around 1 to 1.5”. Scrap the surface and put some more ramming mass again checking the level to 2 to 3”. Repeat the operation till the required level is reached. Always go approx. 5’ more and scrap to desire thickness of the bottom. This will ensure flat even bottom ramming. In doing the bottom ramming take care of the GLD. All the leads should be seen out of the ramming. The ramming should give ringing sound in last then only the second charge should be given.

Now take the out former. Clean it from outside for rust and dirt, place it inside the furnace. Care should be taken that the former is placed concentric to the bottom i.e., equal distance from all the periphery should be maintained to level equal side thickness of ramming. Place sufficient weight in the former so that will not get displaced while ramming.

Take the spike rammer; poke the side of bottom ramming little bit so as to take the bottom and side homogenous. Put ramming mass to get a level of three to four inches. Two people should start ramming diametrically opposite using spike rammer. Those people should keep moving round, so that equal ramming force is maintained. Ramming should be continued for 30 mm.

Put another round of ramming mass. Continue the operation till first step of sydanco sheet is reached. Now use flat rammer and ramming should be done for five minutes, alternatively put ramming mass to go above the first step, and then scarp it out to first step. Take care not to form layers. layers may lead to puncture as metal can penetrate through the layers.

To make the top-cap and pour spout , mix the same ramming mass with sodium silicate. The mixture should be such that when made a ball it should retail its shape, but if more pressure is applied, its should disintegrate. Put little sodium silicate on the rammed portion-and then put this wet ramming mass. Complete the top-cap and the pour spout. Take 1/8” rod around 12”length. Push it through the top-cap vertically at several places to make holes as deep possible reaching to dry ramming. Do not move the rod side-ways that will deteriorate the top-cap. These holes are required to give way moisture. With this the furnace is ready for sintering. Do not tilt the furnace with raw unsustained lining. This can give rise to cracks and may end in coil puncture.
 
 
 

PACKAGING

At Deepak Ramming Pass (P) Ltd. we emphasize much on packaging part as it is proved to be most preferred part of trade, we have separate clean space for storage and packaging the finished goods with best quality packaging materials.

Our company also possesses a modern packaging facility where all the products are packaged in high-grade packaging material to ensure their superiority during transit.The packaging is selected keeping view the specific needs of the user as well as material. For specific requirements of various chemicals, moisture proof export packing is provided. Packagings are subject to normal aging and products in bags should not be stored longer than 6 months. Information concerning waste management etc. can be found in our safety data sheets.

Write to us for more details. :

deepakminerals007@gmail.com 

RESEARCH & DEVELOPMENT

In order to offer superior quality of Quartz Ramming Mass , Quartz Powder on continuous basis, we have established an advanced Research and Development Wing that is managed by qualified technocrats and engineers. They update themselves consistently on issues of latest technologies being available for industrial uses and incorporation of these technologies in our production line. Further, they also keep themselves aware of the latest manufacturing methodologies that can help us offer improved range of products.
 
Logistics
Deepak Ramming Pass (P) Ltd. pride and its own in providing excellent customer services with fast Shipment and Prompt Delivery of orders as we have strong network and logistics facility in every part of world.
 
 
       
  OUR PRODUCTS QUICK LINKS QUICK CONTACT
 
  QUARTZ RAMMING MASS
  QUARTZ POWDER
  ASBESTOS MILL BOARD
  HOME
  ABOUT COMPANY
  QUALITY CONTROL
  OPERATIONS
  OUR VALUES
  CONTACT US
OFFICE
D-189 , NEAR TAGORE SCHOOL
AMBABARI , JAIPUR - 302023
RAJASTHAN (INDIA)
FACTORY-I
A-210 , RIICO INDUSTRIAL AREA
BAGRU (EXTN.) JAIPUR , RAJASTHAN
VIEW MORE
 
ALL RIGHTS RESERVED @ DEEPAK RAMMING MASS (P) LTD.
E-MAIL : deepakminerals007@gmail.com  |  poojaminerals007@gmail.com
PHONE : +(91) - 141 - 2336284  |  FAX : +(91) - 141 - 2337585  |  MOBILE : +(91) - 98290-11890 , 98291-93841
DISCLAIMER | TERMS & CONDITIONS | PRIVACY POLICY